Upgrade for Savings Enrollment Agreement

| Resume a previously saved form
Resume Later

In order to be able to resume this form later, please enter your email and choose a password.

Password must contain the following:
  • 12 Characters
  • 1 Uppercase letter
  • 1 Lowercase letter
  • 1 Number
  • 1 Special character
Enrollment Agreement

For Hetch Hetchy Customers who qualify to enroll per the criteria in the Program Handbook, complete and sign this online Enrollment Agreement to indicate interest in the program.  Upon receipt, a Program Representative will contact you to confirm and discuss next steps.   


For questions or assistance, contact the Upgrade for Savings team at (415) 551-4623 or at SaveEnergy@sfwater.org. 

Customer Information










Project Site Information







Available Supporting Documentation (Narratives, Drawings, Manufacturer Specifications, Energy Savings Calculations, Estimated Project Costs)

Authorized Customer Agent (if applicable)






Statement of Interest

I, the undersigned agree as follows:


1.    I have read and understand all Program Documents including the SFPUC Upgrade for Savings Program Handbook (“Handbook”) and I would like to participate in the Upgrade for Savings Program. 

2.    I am the customer or the customer’s Agent.

3.    I am interested in improving the energy efficiency of my building with a Project that qualifies for the Minimum Qualifying Incentive amount. I certify that all information provided is true and accurate, and I will agree to all documentation and other applicable requirements as set forth in the Handbook.

4.    By submitting this Enrollment Agreement, I attest that I am an existing Hetch Hetchy Power customer or have submitted an application to connect Hetch Hetchy Power electricity service to the site. 

5.    I understand that participation in the Upgrade for Savings Program is voluntary, and that I am under no obligation to accept technical support offered under this Program, or to modify the design or construction of my Project based upon program-offered technical support or recommendations. 

6.    I understand that existing equipment required to establish the project baseline must be available for pre-inspection, and that I am responsible for ensuring that SFPUC and/or its agents have reasonable access to the facilities for the purpose of carrying out Program-related activities, including pre- and post-project inspections and, if offered and agreed to, technical support services.

7.    SFPUC’S AND/OR ITS CONSULTANTS’ IDENTIFICATION OF POTENTIAL ENERGY UPGRADE PROJECTS, OR REVIEW OF THE DESIGN, CONSTRUCTION, OR OPERATION OF SUCH PROJECTS SHALL NOT CONSTITUTE ANY REPRESENTATION AS TO THE ECONOMIC OR TECHNICAL FEASIBILITY, OPERATIONAL CAPABILITY, OR RELIABILITY OF THE PROJECT, NOR SHALL OWNER, IN ANY WAY, MAKE SUCH A REPRESENTATION TO A THIRD PARTY. OWNER IS SOLELY RESPONSIBLE FOR THE SELECTION, DESIGN, INSTALLATION, ECONOMIC AND TECHNICAL FEASIBILITY, CONSTRUCTION, OPERATIONAL CAPABILITY AND RELIABILITY OF THE PROJECT. SFPUC MAKES NO REPRESENTATIONS OR WARRANTIES REGARDING THE PROJECT, THE UPGRADE FOR SAVINGS PROGRAM, OR THE INCENTIVES, WHETHER STATUTORY, EXPRESS OR IMPLIED, INCLUDING, WITHOUT LIMITATION, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, USE OR APPLICATION AND SPECIFICALLY DISCLAIMS ANY SUCH WARRANTY, EXPRESS OR IMPLIED.  

8.    I agree to indemnify, defend, and hold harmless the City, its officials, managers, agents, and employees from and against all claims, losses, damages, costs, expenses, and liability arising from (i) injury to or death of any person, (ii) injury to property or any other interests of the City, Owner, or any third party, (iii) violation of any law or regulation, or (iv) energy savings shortfall, arising from or in any way connected to the Project, however caused and regardless of any strict liability or negligence of City.

9.    I understand that SFPUC retains the sole discretion regarding what technical support is provided and in determining the appropriate methodologies and values used to calculate the incentive payment amounts. I understand that the Financial Incentives are available only if 1) I complete an Application & Incentive Agreement; 2) eligibility is established by the SFPUC; 3) the Project is installed and verified: and 4) the Project is in compliance with all Upgrade for Savings Program rules and requirements outlined in the Upgrade for Savings Program Handbook.

10. By using this form and signing electronically, I agree and understand that this electronic signature is the legal equivalent of my manual/handwritten signature.