Resume Later

In order to be able to resume this form later, please enter your email and choose a password.

Password must contain the following:
  • 12 Characters
  • 1 Uppercase letter
  • 1 Lowercase letter
  • 1 Number
  • 1 Special character
solar logo

Generator Interconnection applications are required for all Generating Facilities and Energy Storage Devices (batteries) that will interconnect with utility provided electric service.  Submission of this Generator Interconnection Application begins Hetch Hetchy Power’s assessment of electrical system needs and capacity related to the proposed interconnection request. It does not guarantee that SFPUC will be able to accommodate the request or provide Net Energy Metering service. Net Energy Metering must be applied for separately.

Additional supporting documentation will be requested on the following pages, see the Generating Facility Interconnection Checklist on www.sfpuc.gov/nem. Review the Rules and Regulations Governing Electric Services" which can be found at www.sfpuc.gov/ElectricRules for details on Customer-owned generator service.

Select Program
Distribution Grid Mechanism

Application Type

Net Energy Metering

Project Details











Contact Information


Customer of Record (Customer as listed on electric utility bill)







Generating Facility Installer












Primary Contact

Generating Facility Owner

Customer of Record to be included on Generating Facility Interconnection Agreement (GFIA)












Description of the Generating Facility
Variances from PG&E's Distribution Interconnection Handbook (DIH) and Greenbook Requirements


Interconnection Type











Generating Facility Basic Information
Solar PV and Other Electric Generators








_______ Amps at _______ Volts

Demand Load: ____ kVA (AC) at ____ Volts








Energy Storage Devices (ESD)













Transformer Information











Initial Operation Date


The SFPUC is unable to make any guarantees as to achieving PTO deadlines, particularly where Points of Interconnection are on the PG&E distribution grid.  It is the Applicant’s responsibility to provide ample time for Interconnection document processing and Inspection scheduling.
Warranty Information
Note: You must select "Yes" to at least one of the questions. If you select "No" to both questions, the application will be rejected.


Generating Facility Components
For Solar, Provide Below Information 

Additional supporting documentation will be requested on the following pages, see the Checklist on www.sfpuc.gov/nem.
Solar Inverter
Manufacturer  Model         Number Nameplate Rating (kW)
Efficiency Rating  (%)
Output Voltage Rating  Software Version Quantity
California Energy Commission (CEC) ratings for inverters available here.








Solar PV Module
Manufacturer  Model             Number Nameplate Rating
(W/unit)
PTC Rating  (W/unit)
Total Nameplate Capacity (W)  Quantity
PTC: PVUSA Test Conditions. PTC ratings for PV modules available here.







AC Disconnect Switch
Manufacturer Model Number Rating (amps)  Quantity





After you review and confirm your application answers, they will be finalized. On the following pages, you will upload supporting documentation and sign an acknowledgement of the SFPUC terms. For required documentation, see the Generating Facility Interconnection Checklist on www.sfpuc.gov/nem.
Hidden Fields for Record Transfer to Salesforce (INTERNAL USE)