Refer to the Application Checklist found on www.sfpuc.gov/hetchydevelopers to complete this form. Submit separate forms for temporary construction power and permanent power.
Incomplete or missing information will cause delays in processing and may result in the request being rejected.
Project Information




























Hours /Day Days/Week Months/Year Business Hours
Summer Operating Hours
Hours /Day Days/Week Months/Year Business Hours
Winter Operating Hours

Provide a brief description of the project and load type. Include supply details, such as "irrigation pump" or "temporary construction power for new affordable housing development."  Describe the metering setup, such as Switchgear(s) details and associated retail meters for each service point.
Contact Information

Other: Role/Relationship to Project
                                          
Applicant Information












Owner/Developer Information (if different from Applicant)












Representative Information (if different from Applicant/Owner)












Professional Electrical Engineer of Record











Electric Load Information



Specify Other:
Electric Load Breakdown
All applicants must provide a completed SFPUC Electric Load Breakdown file for each requested Service Point. Only provide data as total Connected Load behind service switchgear. Provide additional files as needed. Download a template at www.sfpuc.gov/hetchydevelopers.  Note, electric load details in other formats will not be accepted in lieu of the SFPUC Electric Load Breakdown file.

Ramp Up Schedule
When will the load reach the below percentages of total forecast?
Estimated whole week(s) after Energization Date
25% of Electrical Load
50% of Electrical Load
75% of Electrical Load
100% of Electrical Load
Street/Sidewalk Improvement
Does the project include any street/sidewalk improvement along public streets?                                
If yes, contact slengineering@sfwater.org .
Customer Self Generation and Net Energy Metering
This Application form is for electric service only. The installation and interconnection of self-generation equipment, including photovoltaic systems, requires the submission of a Customer-Owned Generator Interconnection Application when ready. Visit www.sfpuc.gov/nem for more information.
Do you plan to install onsite self-generation equipment?                                                                      

Hidden Fields for Record Transfer to Salesforce (INTERNAL USE)
This is the default information for the required fields in Salesforce.






After you review and confirm your application answers, they will be finalized. On the following pages, you will upload supporting documentation and sign an acknowledgement of the SFPUC terms.
For required documentation, see the Hetch Hetchy Power Checklist at: www.sfpuc.gov/hetchydevelopers.